I have a P-19 that I almost always take out by myself. So far I have
always launched from the trailer. I usually estimate between 45
minutes and an hour. Taking down takes between 60 and 90 minutes. I
am usually moving slower by the end of the day.
Roger Metcalf
P-19 #471 "Manstoy"
Tacoma, WA
Puget Sound
------------------------------------------------------------------------
High rates giving you headaches? The 0% APR Introductory Rate from
Capital One. 9.9% Fixed thereafter!
http://click.egroups.com/1/3010/3/_/917698/_/956014597/
------------------------------------------------------------------------
Post: WWPotter@egroups.com
Help: WWPotter-owner@egroups.com
This archive was generated by hypermail 2b29 : Sun Apr 30 2000 - 03:27:11 PDT